Jump to content

IA machine install: Difference between revisions

From LB Knowledge Base
add machine ia install
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 61: Line 61:
8. Connect machine wiring cable IA type to coindrop - board cable.
8. Connect machine wiring cable IA type to coindrop - board cable.


(1) Disconnect coindrop power to board cable and connect with LBPayLinker coindrop wiring cable.
(1) Disconnect coindrop cable and connect LBPayLinker wiring cable to the coindrop.
[[File:Connect lbpaylinker cable to coindrop.png|center|thumb]]


(2) Disconnect coindrop signal to board cable and connect with LBPayLinker signal wiring cable.   
 
(2) Disconnect board cable and connect LBPayLinker signal wiring cable to the board. 
[[File:Connect lbpaylinker cable to board.png|center|thumb]]  


9. Connect machine power source connector to the board.
9. Connect machine power source connector to the board.
10. After installation, IA LCD screen will display error "Out of order".
[[File:Ia machine error resize.jpg|center|thumb]]
This indicate the device need to change the setting parameter for the machine. Next step is to configure the LBPayLinker device app through admin app. [[Configure device using admin app]]
== Installation Video ==
Click link below to view installation video.
https://lbunlimitedwash.com/lbwiki/video/IA_Device_installation.mp4

Latest revision as of 00:37, 27 April 2026

Pre-requisites

[edit | edit source]
  • Open machine cover
  • Type of LBPayLinker devices (Model NYJ or A1)
  • Type of LBPayLinker wiring cable (BC, IA or TOSEI)

IA Machine

[edit | edit source]


Getting Started

[edit | edit source]
  1. Make sure the LBPayLinker model Type. See picture.
NYJ31
A1

2. Check LBPayLinker parts.

  • For model NYJ31 - antenna and machine wiring cable
  • For model A1 - interface cable and machine wiring cable
NYJ31
A1


3. Connect the interface cable on the device.

NYJ31
A1


4. Open IA machine cover.

5. Locate power connector and disconnect it to shutdown the machine.


6. Locate coindrop interface cable to machine board.

(1) Coindrop power to board

(2) Coindrop signal to board

7. Locate LBPayLinker machine wiring cable.


8. Connect machine wiring cable IA type to coindrop - board cable.

(1) Disconnect coindrop cable and connect LBPayLinker wiring cable to the coindrop.


(2) Disconnect board cable and connect LBPayLinker signal wiring cable to the board.

9. Connect machine power source connector to the board.

10. After installation, IA LCD screen will display error "Out of order".


This indicate the device need to change the setting parameter for the machine. Next step is to configure the LBPayLinker device app through admin app. Configure device using admin app

Installation Video

[edit | edit source]

Click link below to view installation video.


https://lbunlimitedwash.com/lbwiki/video/IA_Device_installation.mp4