Jump to content

IA machine install: Difference between revisions

From LB Knowledge Base
add ia install content
add ia install content
Line 66: Line 66:


9. Connect machine power source connector to the board.
9. Connect machine power source connector to the board.
10. After the device done installation, next step is to configure the device
== Installation Video ==
Click link below to view installation video.




https://lbunlimitedwash.com/lbwiki/video/IA_Device_installation.mp4
https://lbunlimitedwash.com/lbwiki/video/IA_Device_installation.mp4

Revision as of 05:45, 20 April 2026

Pre-requisites

  • Open machine cover
  • Type of LBPayLinker devices (Model NYJ or A1)
  • Type of LBPayLinker wiring cable (BC, IA or TOSEI)

IA Machine


Getting Started

  1. Make sure the LBPayLinker model Type. See picture.
NYJ31
A1

2. Check LBPayLinker parts.

  • For model NYJ31 - antenna and machine wiring cable
  • For model A1 - interface cable and machine wiring cable
NYJ31
A1


3. Connect the interface cable on the device.

NYJ31
A1


4. Open IA machine cover.

5. Locate power connector and disconnect it to shutdown the machine.


6. Locate coindrop interface cable to machine board.

(1) Coindrop power to board

(2) Coindrop signal to board

7. Locate LBPayLinker machine wiring cable.


8. Connect machine wiring cable IA type to coindrop - board cable.

(1) Disconnect coindrop power to board cable and connect with LBPayLinker coindrop wiring cable.

(2) Disconnect coindrop signal to board cable and connect with LBPayLinker signal wiring cable.

9. Connect machine power source connector to the board.

10. After the device done installation, next step is to configure the device

Installation Video

Click link below to view installation video.


https://lbunlimitedwash.com/lbwiki/video/IA_Device_installation.mp4