Jump to content

IA machine install

From LB Knowledge Base
Revision as of 21:28, 22 April 2026 by Admin (talk | contribs)

Pre-requisites

  • Open machine cover
  • Type of LBPayLinker devices (Model NYJ or A1)
  • Type of LBPayLinker wiring cable (BC, IA or TOSEI)

IA Machine


Getting Started

  1. Make sure the LBPayLinker model Type. See picture.
NYJ31
A1

2. Check LBPayLinker parts.

  • For model NYJ31 - antenna and machine wiring cable
  • For model A1 - interface cable and machine wiring cable
NYJ31
A1


3. Connect the interface cable on the device.

NYJ31
A1


4. Open IA machine cover.

5. Locate power connector and disconnect it to shutdown the machine.


6. Locate coindrop interface cable to machine board.

(1) Coindrop power to board

(2) Coindrop signal to board

7. Locate LBPayLinker machine wiring cable.


8. Connect machine wiring cable IA type to coindrop - board cable.

(1) Disconnect coindrop power to board cable and connect with LBPayLinker coindrop wiring cable.

(2) Disconnect coindrop signal to board cable and connect with LBPayLinker signal wiring cable.

9. Connect machine power source connector to the board.


10. After installation, IA LCD screen will display error "Out of order".


This indicate the device need to change the setting parameter for the machine. Next step is to configure the LBPayLinker device app through admin app.

Installation Video

Click link below to view installation video.


https://lbunlimitedwash.com/lbwiki/video/IA_Device_installation.mp4